国内精品视频一区二区三区八戒,亚洲一区色图,91专区,yellow网站在线观看

SHENZHOU MANUFACTURING GROUP

+86-315-2961888/+86-315-2965555

Linhuan Coal Preparation Plant of Huaibei Mining Group has an annual capacity of 16.0mt/a. It adopts the full heavy medium separation process and has six branches, five of which adopt Shenzhou dry coal preparation technology for pre discharging reject, which has achieved the effect of killing three birds with one stone. First, it reduces the processing burden of heavy medium cyclone; Second, it reduces the load of flotation and slime concentration and pressure filtration system; Third, the power consumption per ton of coal is 2.6kw · h, and the proportion of washing per ton of coal saves 4.29kw · H. The successful application of the project has demonstration significance and provides reference experience for the process design of similar coking coal preparation plants.


ITEM

yield Wt%

ASH Ad%

RAW COAL

100

76.79

CLEAN COAL

34.82

55.58

REJECT

65.18

88.12

LIN HUAN COAL PREPARATION PLANT OF HUAIBEI MINING GROUP

TIME: 2022-03-07
FOLLOW WITH OUR WECHAT,?
TO KNOW MORE ABOUT SHENZHOU GROUP.

PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

ONLINE MESSAGE

沾益县| 长治市| 扶风县| 武宁县| 通山县| 天镇县| 隆昌县| 桐庐县| 洛隆县| 阿合奇县| 新干县| 绥德县| 米泉市| 边坝县| 区。| 陆河县| 海晏县| 霞浦县| 蕲春县| 淮北市| 将乐县| 泰州市| 大安市| 巨野县| 尼勒克县| 丹东市| 综艺| 民权县| 本溪| 大兴区| 苗栗市| 托里县| 汝城县| 昭觉县| 手机| 若羌县| 商南县| 泾阳县| 镇原县| 大邑县| 思茅市|