国内精品视频一区二区三区八戒,亚洲一区色图,91专区,yellow网站在线观看

SHENZHOU MANUFACTURING GROUP

+86-315-2961888/+86-315-2965555

Linhuan Coal Preparation Plant of Huaibei Mining Group has an annual capacity of 16.0mt/a. It adopts the full heavy medium separation process and has six branches, five of which adopt Shenzhou dry coal preparation technology for pre discharging reject, which has achieved the effect of killing three birds with one stone. First, it reduces the processing burden of heavy medium cyclone; Second, it reduces the load of flotation and slime concentration and pressure filtration system; Third, the power consumption per ton of coal is 2.6kw · h, and the proportion of washing per ton of coal saves 4.29kw · H. The successful application of the project has demonstration significance and provides reference experience for the process design of similar coking coal preparation plants.


ITEM

yield Wt%

ASH Ad%

RAW COAL

100

76.79

CLEAN COAL

34.82

55.58

REJECT

65.18

88.12

LIN HUAN COAL PREPARATION PLANT OF HUAIBEI MINING GROUP

TIME: 2022-03-07
FOLLOW WITH OUR WECHAT,?
TO KNOW MORE ABOUT SHENZHOU GROUP.

PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

ONLINE MESSAGE

赤城县| 滨海县| 桐庐县| 利津县| 三都| 阜南县| 邹平县| 马龙县| 长白| 台南县| 文山县| 台山市| 伊川县| 寻乌县| 黄骅市| 汉阴县| 苍梧县| 衢州市| 金坛市| 平塘县| 长葛市| 苗栗县| 罗甸县| 余干县| 容城县| 嘉禾县| 黄大仙区| 清镇市| 磴口县| 东海县| 蒙山县| 合川市| 穆棱市| 赣州市| 象州县| 财经| 徐州市| 汉川市| 开江县| 共和县| 股票|