国内精品视频一区二区三区八戒,亚洲一区色图,91专区,yellow网站在线观看

SHENZHOU MANUFACTURING GROUP

+86-315-2961888/+86-315-2965555

Located in wedbank coalfield, South Africa, Kral coal mine invested in the construction of a 3.0mt/a dry coal preparation plant in 2010 to separate No. 2 thermal coal. The ash content of raw coal is 40.4%, the ash content of cleaned coal after beneficiation is 30.6%, and the recovery rate is 85%. It is mainly sold to power plants. The dry separation plant has an hourly processing capacity of 500 tons and an annual operation of 6000 hours. It has the advantages of short investment payback period, low operation cost and high recovery rate.

KRAL COAL MINE

TIME: 2022-03-07
FOLLOW WITH OUR WECHAT,?
TO KNOW MORE ABOUT SHENZHOU GROUP.

PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

ONLINE MESSAGE

怀集县| 饶河县| 香格里拉县| 名山县| 永川市| 谢通门县| 河池市| 博白县| 蕲春县| 南阳市| 大丰市| 英超| 志丹县| 东平县| 连南| 金沙县| 霍山县| 晋宁县| 舒兰市| 丘北县| 上杭县| 祁阳县| 当阳市| 萝北县| 扎兰屯市| 东辽县| 奈曼旗| 阿勒泰市| 深泽县| 大石桥市| 东丰县| 丰城市| 宜良县| 上高县| 聂拉木县| 商南县| 灵寿县| 麻栗坡县| 大方县| 竹北市| 惠来县|